"Ultimately this is going to contribute to more region-wide affordability as more units come online and as the market adjusts," Aaron Barrall, a housing data analyst with UCLA's Randall Lewis Housing Initiative, told the Daily Bruin in July. He was talking about a new state housing law and the two D Line stations coming to Westwood.
For a buyer comparing Westwood with the rest of the Westside, his quote describes two forces at once. The subway is coming. So are a lot of new units, and they are going up next to the stations. A station usually raises the value of nearby homes because it makes them easier to reach. In Westwood, the blocks that gain the most access also take on the most new competition and the longest construction. Homes a short walk away get the same trains with less of both.
Metro's October 2026 community presentation puts the remaining openings at Spring 2027 for Section 2, which adds Beverly Dr and Century City, and Fall 2027 for Section 3, which adds Westwood/UCLA and Westwood/VA Hospital. Metro marks both dates as subject to change.
The construction progress in that October report fits a station that is close to done but not finished. At Westwood/UCLA, MEP installation stood at 86% and the main entrance at 80%. Elevators and escalators were at 20%, the northeast entrance at 48% and the southeast entrance at 29%. At Westwood/VA Hospital, the main entrance stood at 87% and escalators and elevators at 6%.
The housing projects near the stations run on their own schedules, and several finish after the trains start running.
| Milestone | Location | Timing |
|---|---|---|
| Section 2 opens | Beverly Dr and Century City stations | Spring 2027, Metro forecast |
| Section 3 opens | Westwood/UCLA and Westwood/VA Hospital | Fall 2027, Metro forecast |
| The Hive leases its next school year | 535 Glenrock Ave | Leasing for fall 2027–28 |
| 901 Levering completion | Gayley and Levering | Targeted for January 2029 |
A buyer who closes this winter near Wilshire and Gayley will live through about a year of station finishing work, alongside tower construction at Levering that is already underway and targeted to finish in January 2029.
Section 1 is the best evidence of what the new Westwood stations are likely to bring. Wilshire/La Brea, Wilshire/Fairfax and Wilshire/La Cienega opened May 8, 2026. Metro reported that D Line ridership in May 2026 was up 62% from May 2025. Metro estimates the three new stations added 8,000 to 10,000 rides a day that month, and weekend D Line ridership was up nearly 80% year over year.
Metro's rider guide puts Wilshire/La Cienega to Union Station at just over 20 minutes. The Los Angeles Times set Metro's 21-minute estimate against about 45 minutes by car, and up to 70 at rush hour.
Once Section 3 opens, a Westwood resident heading east has Century City as the next stop and then a single line to Beverly Hills, Mid-Wilshire and downtown. The May numbers show people take the train when it serves the trip they already make. For a Westwood buyer, that kind of access is worth having. The open question is how much of its value shows up in the price of any one home.
The answer depends on what else is being built within walking distance of the same platform. In Westwood, much of it is going up within a few blocks of Wilshire and Gayley.
In May 2026, Douglas Emmett filed plans for 10900 Wilshire. The filing turns the 17-story office tower into 199 apartments and adds a seven-story building with 124 more, for 323 units, according to The Real Deal. The project sits on the stretch of Wilshire between Veteran Avenue and Westwood Boulevard, where Metro's lane restrictions currently run.
UCLA's projects sit north of the same intersection. Its Gayley Towers project at 565 Gayley Ave. has 545 beds, and 358 of them are priced at $600 a month for lower-income students, Urbanize LA reported. The UC Regents approved 901 Levering Avenue on March 18, 2026. It is a 19-story tower with roughly 150 apartments and more than 1,100 student beds. UCLA's own environmental document describes the Levering site as a short walk from the Westwood/UCLA station.
UCLA has said publicly what it expects all that housing to do. When a Regents committee recommended $351 million for Levering in March, the Daily Bruin reported that the university said added student housing could help lower rents in private Westwood apartments. The paper also reported a projected monthly rate of $1,489 for the new building.
Put the train schedule next to the construction pipeline and the subway's benefit looks uneven across Westwood.
A condo on Wilshire near Gayley. This home gets the shortest walk to the platform. It also has the most new units within the same short walk. If the plan is to rent the condo to UCLA students or staff, the new competition is easy to count. Gayley Towers, Levering, 10900 Wilshire and The Hive at 535 Glenrock add up to hundreds of apartments and well over 1,500 beds. UCLA itself says this supply could push private rents down. An owner who plans to live in the condo gets the station at full value, and also lives on the blocks where Metro and UCLA are working longest. The Daily Bruin's November report on Levering described road and sidewalk closures at Gayley and Levering, with completion targeted for January 2029.
A home in the residential pockets a walk from the station. Holmby-Westwood, Westwood Hills and the streets around Westwood Village are served by the same two stations. The projects named above are on Wilshire, Gayley, Levering and Glenrock, closer to the Westwood/UCLA platform than these residential streets. Metro's October report expected no full street closures in the near future and listed lane restrictions on Wilshire, Westwood Boulevard and Gayley.
A home near Westwood/VA Hospital. The west station is on the same forecast as Westwood/UCLA. Its elevators and escalators were at 6% in October, so it is the one to watch over the next few quarterly updates.
The reasoning here is about supply. Better access raises demand for a location, and new supply built inside that same location takes back part of the gain. In Westwood, the announced new supply is going up within a few blocks of the Westwood/UCLA platform.
When will Westwood residents actually be able to ride? Metro's current forecast is Fall 2027 for Westwood/UCLA and Westwood/VA Hospital, with Century City opening first in Spring 2027. Metro labels both dates subject to change.
Is Wilshire closed for the work? Metro's October 2026 report listed lane restrictions on Wilshire between Veteran Avenue and Westwood Boulevard and on Westwood Boulevard and Gayley Avenue for entrance and restoration work, and said it did not expect full street closures in the near future.
Does the new student housing matter if I'm buying to live there? Less than it does for a buyer who plans to rent. For an owner who lives in the home, it matters mostly as construction on nearby blocks through Levering's January 2029 target.